Chicken Wire 2

From Bottle School Wiki

Jump to: navigation, search
caption goes here
caption goes here
caption goes here
  • Once the bottles are in place, stretch the chicken wire over the outside of the building.
  • Use the same technique as before, but cut the 1/4 inch rebar a little longer than the openings this time.
  • Threading will be easier with shorter pieces.
  • Secure chicken wire on top of section and stretch downwards.
  • Vertical rebar supports are needed every other column. Flatten pins to hold.
  • Once both sides of the chicken wire are in place, tie the two sides together with tie-wire every fifth bottle, every other row, and where needed.
Personal tools