Clear and level land

From Bottle School Wiki

Jump to: navigation, search
Busting rocks
Once land is clear and level, stake out the perimeter
Mark the height of the water in the tube to level the foundation
Trench dug and ready for foundation
  • The construction site must be cleared and leveled prior to starting construction.
  • A sloped construction site may necessitate a retaining wall; check with local engineers for specs based on soil composition and degree of slope.
  • When staking the guides, a clear hose filled with water can be a handy tool to ensure a level construction.
  • Measure and demarcate the perimeter with stakes and string.
  • Dig trench in preparation for foundation.
Personal tools