• Place the wooden form that you used for the lower beam between the already poured columns to form the intermediate beam or top beam, depending on where you are in the construction process.
• Tie rebar together in the same way as for the floor beam, and place it above corresponding poured columns.
• Place forms around the rebar cage, nailing in place with previously placed bottom boards. You can reuse the forms from the lower beam.